Colmac generate steam directly from water inside the machine instead of drawing it from a house boiler. They were the first to install a direct water-to-steam tunnel, and the patented boilerless design is now offered across the finishing range.
The reason to care is not the technology, it is the building. A plant without spare boiler capacity normally faces a boiler project before it can face a finishing project, and that is where most retrofits die. This removes that step.
Run the numbers on operating cost against a steam-heated machine on a boiler you already own — if the boiler exists and has capacity, boilerless is solving a problem you do not have. If it does not, this is often the only route to a tunnel at all.
Platform
Boilerless garment finisher
Steam generation
Direct water-to-steam, integral to the machine
Boiler requirement
None
Water
Confirm supply and treatment requirements at order
Application
Plants without spare boiler capacity; retrofit installations
Dimensions
Confirm against the current specification sheet
Configuration pricing
Price shown is a base configuration — module count, heat source and controls change it
Manufacture
Built in Colville, Washington
Certification
Confirm CSA / cETL listing for the Canadian market
Warranty: Warranty is administered directly by the manufacturer under their standard commercial terms. Registration details ship with the machine.